EDF is not Stocked.
Once order is placed it will take approx. 7 Business Days to get your EDF Built and Shipped out.
Price Includes Shipping ($ 41.43usd)
Customer to Pay Duties & Taxes
Don't forget to Order Fuse Inlet Lip
- Improved aerodynamics on the stator for maximum thrust
- Reliability even in high temperature
- Rotor reinforced with optimized carbon fiber layers for maximum crash resistance and reliability
- Slightly increased impeller throughput area leads to more take off thrust
- Ribbed all-aluminum stator, together with patented air cooling ensures a cool engine operation at all times
- Three different motor options
- Motors haven been optimized magnetically and equipped with a stiff 10 mm precision shaft
- All rotating components are fine-balanced
- The propulsion is built from finest carbon/epoxy and aluminum parts
- High modulus carbon
Engineered and made in Germany